First Article Inspection (FAI) Guide

Home › Blog › First Article Inspection Guide

Quality Process Guide

First Article Inspection (FAI): What It Is, What Buyers Receive, and Why It Matters

 ·  Quality Process Guide

When a buyer places a first production order, the question is always the same: are the parts actually built to drawing? First article inspection — FAI — is the documented answer. It is a formal verification that the first units off a production process conform to every requirement on the engineering drawing before a full run is released.

This guide explains what a first article inspection covers, how it differs from PPAP, which standard governs it in aerospace contexts, and what documentation a supplier should hand over when FAI is complete. At the bottom, there is a short section on how VNcontX runs FAI on CNC machined parts — part of our broader quality management process that covers every order from incoming material to final shipment authorization.

Digital caliper measuring CNC machined metal part during first article inspection at precision manufacturing facility

100%FAI on Every Order
±0.005mmStandard Tolerance
Zeiss + MitutoyoCMM Equipment
ISO 9001:2015Certified Facility

What Is a First Article Inspection (FAI Inspection)?

A first article inspection — also called an FAI inspection or 1st article inspection — is a structured review of the first part — or small sample from the first production run — against the engineering drawing and any referenced specifications. The goal is to confirm that the manufacturing process, tooling, and setup can consistently produce a part that meets all dimensional, material, and finish requirements before volume production begins.

FAI is not a random sample audit and it is not the same as incoming inspection on a repeat order. It applies specifically at the start of a new part number, after a design change, after a process change, or after a supplier change. In each of those cases, the production baseline has shifted and needs to be re-confirmed with objective evidence.

The term “first article” refers to the part itself — a physical unit produced under production-representative conditions. The inspection report is the documentation that records all measurement results against drawing requirements, with pass/fail notation for each characteristic.

Key Distinction

First article inspection is a process qualification, not a product acceptance step. It confirms that the production method is capable of making the part correctly — not just that one specific unit happened to be within tolerance.

AS9102: The Aerospace FAI Standard

In aerospace manufacturing, first article inspection is governed by AS9102, published by SAE International and aligned with EN 9102 in Europe. The standard defines three forms that make up a complete FAI package:

1
Form 1 — Design Documentation
Confirms the drawing revision used for manufacture matches the current release. Records the engineering drawing number, revision letter, and any applicable specifications or notes referenced on the drawing.

2
Form 2 — Product Accountability
Documents material and raw stock traceability — material certifications, heat lot numbers, chemical composition conformance. Also covers any hardware or purchased components built into the assembly.

3
Form 3 — Characteristic Accountability
The dimensional section. Every characteristic called out on the drawing is listed with its nominal value, tolerance, actual measured value, and pass/fail result. This is the core of the inspection record.

AS9102 also requires that the inspection be performed on a part produced using production tooling, production processes, and production personnel — not a hand-finished sample built outside the normal workflow. The representative production environment requirement is what gives the FAI its value as a process confirmation.

Outside aerospace, most industrial buyers reference the same three-form structure informally, even when AS9102 is not explicitly required. The logic is the same regardless of industry: drawings, materials, and dimensions all need documented sign-off before volume starts.

FAI vs PPAP: What Is the Difference?

PPAP — Production Part Approval Process — is the automotive industry’s equivalent of FAI. Both exist to confirm production readiness before a volume run ships. The difference is in scope and paperwork depth.

FAI (AS9102) PPAP (AIAG)
Industry origin Aerospace / defense Automotive (OEM supply chain)
Governing standard AS9102 / EN 9102 AIAG PPAP Manual (4th ed)
Submission levels Full / partial / re-validation Levels 1–5 (Level 3 most common)
Process capability data Not explicitly required in standard Required — Cpk / Ppk per characteristic
FMEA / control plan Not part of standard FAI Required at Level 3+
Sample size Typically 1–5 parts Minimum 30 parts for Cpk studies
When triggered New part, design change, process change, supplier change Same triggers — plus new production location

For most industrial and medical device buyers, FAI (without full PPAP) is sufficient for CNC machined parts. The key deliverables are the same: material traceability, dimensional conformance, and a record that the part was inspected against the current drawing revision.

If your quality system requires PPAP with Cpk studies, confirm this with your supplier before order placement — PPAP requires a larger sample population and additional documentation that adds lead time.

What a First Article Inspection Report Should Contain

A compliant FAI package for CNC machined parts covers the following items. If a supplier’s report is missing any of these, ask before approving the first article.

  • Drawing identification — part number, revision, date of drawing used
  • Material certificate (CoC) — alloy grade, heat/lot number, chemical and mechanical properties
  • All dimensional characteristics measured, with nominal, tolerance, actual, and pass/fail columns
  • Measurement method noted per characteristic — caliper, CMM, surface profilometer, thread gauge
  • GD&T callouts measured individually — flatness, perpendicularity, true position each recorded separately
  • Surface finish measurement data (Ra) where specified on drawing
  • Finishing or coating confirmation — anodize class, passivation standard, plating thickness if applicable
  • Inspection date and inspector identification
  • Supplier sign-off with part serial/trace number linking report to physical part

For a step-by-step review framework covering all 47 checkpoints across documentation, dimensional, GD&T, material, surface finish, and process records, see the 47-point FAI checklist for CNC parts.

Buyer Action Item

When you receive an FAI report, verify the drawing revision on the report matches the revision you sent. A common error is FAI performed against an outdated rev — the measurements may all pass, but they’re proving conformance to the wrong requirement.

When First Article Inspection Is Required

FAI is not just for new part numbers. The following events each require a fresh first article — a repeat order does not automatically carry over the previous FAI approval if any of these conditions have changed.

Triggering Events
  • New part number being introduced to production for the first time
  • Engineering change — any drawing revision that modifies a dimension, tolerance, or material specification
  • Process change — different machine, different cutting tool, change in setup or fixturing
  • Supplier change — moving a part from one subcontractor to another, even using the same drawing
  • Extended production gap — most quality systems define this as 12–24 months of inactivity, though the buyer may set a shorter threshold
  • Non-conformance disposition that modifies the accepted baseline

For low-volume precision work — prototype runs, pre-production builds, and early design validation — FAI on the first unit serves a second purpose: it gives the design team dimensional feedback they can use to confirm tolerances are achievable before committing to a larger order.

How VNcontX Runs First Article Inspection on CNC Orders

Every order shipped from our Bình Chánh facility includes a full FAI report — not as an option, and not on request. The inspection runs on a Zeiss Contura CMM or Mitutoyo coordinate measuring equipment depending on part geometry. Surface finish is measured with a Mitutoyo SJ-210 profilometer. All results are recorded in a CMM dimensional report delivered in PDF with the shipment.

The report documents each callout on the drawing individually. GD&T features — true position, perpendicularity, flatness, runout — are each measured and recorded with actual deviation, not simply noted as “within tolerance.” Material certificates (CoC) from our stock suppliers are attached as a separate page in the same PDF package.

01
Drawing Review Before Machining
We review GD&T callouts, tight tolerances, and critical features before the job is programmed. Potential measurement issues are flagged to the buyer before material is cut.

02
In-Process Check
Critical dimensions are verified at the machine before the part is released from the fixture. This catches setup errors before the first article reaches final inspection.

03
CMM Dimensional Report
The first part off the run goes to CMM. All characteristics on the drawing are measured. Actual values and deviations are recorded against nominal. The report is generated as a PDF with a drawing overlay showing measurement points.

04
Material Documentation
Material CoC from our raw stock supplier is attached. For stainless steel and titanium orders, mill test reports (MTR) with chemical and mechanical properties are included as standard.

05
Shipment Package
FAI report, material CoC, and finishing confirmation (where applicable) ship as a single PDF. No part leaves without the documentation package. OTD 98.4%.

Our facility holds ISO 9001:2015 certification. Process capability is tracked with Cpk ≥ 1.67 as the minimum threshold on precision features. If a characteristic measures outside tolerance on the first article, production stops — the part is reworked or re-machined and a corrected FAI is issued before any order ships.

Frequently Asked Questions

Does FAI replace incoming inspection at the buyer’s facility?
No. FAI is a supplier-side process qualification — it confirms the production process produced a conforming part. Incoming inspection at the buyer’s facility is a separate acceptance step and remains the buyer’s responsibility. FAI documentation supports incoming inspection by providing objective measurement data to compare against, but it does not replace it.

How many parts are included in a typical first article inspection?
For CNC machined parts, FAI is typically performed on 1 to 5 parts from the first production run. The sample is not selected arbitrarily — it should be the first part(s) produced under normal production conditions, not a hand-picked best unit. If your quality plan requires a statistical sample size for process capability data (Cpk), this is a separate requirement and needs to be agreed with the supplier before the run begins.

Is a partial FAI acceptable after an engineering change?
Yes, in most cases. A partial FAI covers only the characteristics affected by the engineering change — features that were not changed and were previously approved do not need to be re-measured. The report should clearly identify which characteristics are being re-inspected and reference the previous full FAI approval for unchanged features. Confirm this approach with your supplier and document the decision in writing.

What happens if the first article fails inspection?
The part is rejected and the production run does not proceed. The supplier identifies root cause — setup error, tooling wear, programming issue — corrects it, and runs a new first article. A corrected FAI report is issued against the same drawing revision. Releasing a production run while the first article is under review or before a corrected FAI is approved is a process violation. At VNcontX, no part ships until the FAI is closed with a pass status.

We’re a US company. Is FAI documentation compatible with our quality system?
Yes. Our FAI reports are structured to align with the AS9102 Form 3 format and are delivered as PDF. The report identifies drawing number and revision, lists all characteristics with nominal, tolerance, actual, and pass/fail, includes material CoC with heat lot traceability, and is signed by the inspection technician. If your QMS requires a specific report template or software format, share it before order placement and we will confirm compatibility.

Related Technical Resources

Every VNcontX Order Ships with a Full FAI Report

CMM dimensional data, material CoC, and finish confirmation — included as standard, not on request.

Request a Technical Quote →
Talk to an Engineer →

duc.nguyen@vncontx.com  ·