Home › Injection Molding Vietnam

Vietnam Manufacturing · ISO 9001:2015

Injection Molding Vietnam
Custom Plastic Parts & Tooling

Production-grade injection moulding from Bình Chánh District, Ho Chi Minh City. Tooling cut in-house from P20, H13, or S136 steel — every T1 shipment includes a full CMM dimensional report and material certificate at no charge. ISO 9001:2015 certified. Shot weight 5g to 2,000g. Single to 16-cavity molds.

Parts shipped from Ho Chi Minh City clear US customs at 0% Section 301 tariff — versus 25–145% on equivalent China-origin components. EU buyers benefit from EVFTA zero-duty access. Australian buyers from AANZFTA preferential rates.

Request a Technical Quote → Talk to an Engineer →
[ Ảnh injection mold cavity ]

Alt: “Injection mold cavity — VNcontX, Bình Chánh District, Ho Chi Minh City”
ISO 9001:2015 Cpk ≥1.67 OTD 98.4% FAI 100%
±0.05mm Cavity Tolerance
15–25 Days T1 Lead Time
Cpk ≥ 1.67 Process Capability
0% Section 301 Tariff
ISO 9001:2015 CERTIFIED · ±0.05MM CAVITY TOLERANCE · CMM REPORT EVERY LOT · T1 SAMPLES: 15–25 DAYS · 0% SECTION 301 TARIFF · P20 / H13 / S136 STEEL · SHOT WEIGHT: 5G–2,000G
Factory-Direct

100% in-house — tooling, moulding, inspection. No brokers. No sub-suppliers. You deal with the factory directly at every stage.

CMM-Verified Quality

100% FAI on every order. Zeiss Contura CMM report, material certificate, and Cpk/Ppk data ship with every lot. ISO 9001:2015 certified.

Tariff-Free Export

0% Section 301 (US) · EVFTA zero-duty (EU) · AANZFTA preferential (AUS). Certificate of Origin prepared in-house, every shipment.

Why Buyers Are Moving Injection Moulding Out of China

The Section 301 tariff regime has added 25–145% to the landed cost of plastic injection moulded parts from China depending on HS code. Vietnam-manufactured parts carry none of that exposure. Whether your procurement team quotes “injection moulding” or “injection molding”, parts ship tariff-free from HCMC under the applicable trade agreement — EVFTA for the EU, AANZFTA for Australia, and Section 301 exemption for the US. The tariff gap alone recovers tooling cost on most programs within the first production run.

25–145% China → USA Section 301 tariff on most plastic injection-molded components. Additional supply chain risk from port disruption and lead time variability.

For a full cost comparison including tooling amortization, see: Injection Moulding Cost: Vietnam vs China →

Equipment & Tooling Specifications

All injection moulding tooling is cut in-house at the Bình Chánh facility. No subcontracting. Steel selection is matched to required shot life at the DFM stage — P20 for prototype and medium-run programs, H13 for extended production, S136 or NAK80 for corrosive resins and mirror-finish cavities.

Cavity Tolerance ±0.05mm standard
Shot Weight Range 5g – 2,000g
Cavity Configuration 1 – 16 cavity
Press Size Range 50 – 1,000 tons
Prototype Mold T1 15–20 days (P20/H13)
Production Mold T1 20–25 days
Surface Finish SPI A1–D3 / VDI
Gating Options Direct / Edge / Fan / Hot runner

Tooling Steel Selection

  • ▸

    P20

    — Prototype and medium-run molds. 300,000+ shot life. Lower cost, faster machining cycle. Standard choice for design validation and low-volume production.
  • ▸

    H13 (SKD61)

    — High-volume production molds. 500,000+ shots. Excellent thermal fatigue resistance for high-speed, fast-cycle injection moulding programs.
  • ▸

    S136

    — Corrosion-resistant. 1,000,000+ shots. Specified for PVC, flame-retardant grades, and halogenated resins.
  • ▸

    NAK80

    — Pre-hardened, mirror-polish capable. Optical components and Class-A cosmetic surfaces. 1,000,000+ shots.
  • ▸ Side Actions & Lifters: Fully supported — hydraulic and mechanical, single or multiple per tool.
  • ▸ Insert & Overmoulding: In-house. Brass inserts, SS pins, stamped contacts. TPE/TPU overmould over rigid substrates.

Production Process — 10 Steps from Order to Shipment

Every plastic injection moulding program at VNcontX runs through the same documented 10-step sequence. No steps are skipped for low-volume orders. CMM inspection occurs at Step 5 (FAI) and Step 8 (Final Inspection) as standard.

  • 01 Order Confirmed PO received, NDA countersigned, project folder opened. File access restricted to assigned team.
  • 02 Drawing Review 2D drawing checked against STEP/IGES. Tolerance feasibility, material compatibility, and surface finish calls reviewed.
  • 03 DFM & Quotation Written DFM report issued: wall thickness, draft angles, gate location, parting line, sink/weld line risk. Tooling quotation with lead time returned within 1–3 business days.
  • 04 Material Procurement Resin sourced from certified suppliers. Material certificates collected and filed before production start.
  • 05 FAI / First Article Inspection 100% FAI on every program. T1 samples measured on Zeiss Contura CMM. Full dimensional report issued against drawing before mass production approval.
  • 06 Mass Production Approved parameters locked. Scientific molding parameters (fill pressure, hold time, cooling profile) documented per cavity.
  • 07 In-Process Inspection First-off and periodic checks every production run. Cpk/Ppk tracked on critical dimensions. Defect classification per drawing.
  • 08 Final Inspection 100% visual inspection. CMM sampling on critical features. Cosmetic defect review per agreed AQL.
  • 09 Packing & Labeling Parts packed per customer specification. ESD-safe packaging available. Lot traceability labels applied. Packing list issued.
  • 10 Shipment & Export Docs Commercial invoice, packing list, Certificate of Origin prepared in-house. Air freight LAX 2–3 days. Sea freight US West Coast 18–22 days.

Prototype vs Production Tooling

Steel grade and cavity configuration determine shot life and per-unit cost. Most programs start on a prototype mold and scale to the same steel cavity — no full retooling required for volumes under 300,000 shots.

Prototype MoldFast · Agile Production MoldScale · Quality
Pre-sale DFM review
CMM report included
Mold flow analysis
SPI A1–D3 surface finish
Side actions & lifters
Insert / overmolding
Hot runner system—
Multi-cavity (up to 16)1–2 cavity1–16 cavity
Cpk / Ppk data—
Tool steelP20 / H13H13 / S136 / NAK80
Shot life300,000+500,000–1,000,000+
T1 lead time15–20 days20–25 days
Tooling cost$$$
Per-unit part cost$$$

Quality & Inspection Protocol

ISO 9001:2015 certified. Every production program runs through a fixed inspection sequence documented in the quality plan issued at order confirmation. CMM equipment: Zeiss Contura (coordinate measuring machine) and Mitutoyo calibrated instruments.

  • ✓ 100% FAI on every order: CMM report, material certificate, dimensional report against drawing.
  • ✓ Cpk/Ppk reporting: Process capability data issued on all production mold programs as standard.
  • ✓ In-process checks: First-off and periodic sampling every run. Defects classified per drawing callout.
  • ✓ Lot traceability: Material cert, production date, cavity number, and CMM data retained per lot.
  • ✓ Export documentation: Commercial invoice, packing list, Certificate of Origin — prepared in-house.
  • ✓ OTD 98.4% across all orders. Lead time clock starts at DFM sign-off, not order placement.

See: Injection Molding Tolerances Guide →  ·  Low Volume Injection Molding Guide →

IP & Confidentiality

All design files — STEP, IGES, 2D drawings — are stored on an internal server with access restricted to personnel assigned to that specific program. No files are shared with sub-suppliers because no sub-suppliers are used.

NDA Protocol Countersigned before any file transfer. No exceptions.
File Access Internal server only. Access logged per user per program.
Sub-Suppliers None. 100% in-house — tooling, molding, inspection.
Factory Audits Welcome at any time. On-site or video walkthrough.

Ready to Get a Tooling Quote?

Upload your STEP file and 2D drawing. VNcontX returns a written DFM report and formal quotation within 1–3 business days. Factory-direct — no sales layer, no intermediaries.

Request a Technical Quote → Talk to an Engineer →
Or contact directly: duc.nguyen@vncontx.com  ·