Vietnam Contract Manufacturing Services
VNcontX provides contract manufacturing services from our ISO 9001:2015-certified facility in Bình Chánh District, Ho Chi Minh City. We machine, mold, and fabricate precision parts for engineering teams in the USA, Australia, and the EU — from rapid prototypes to volume production runs. CMM report on every shipment.

Vietnam is not subject to Section 301 tariffs. For US-based procurement teams moving production from China, that is a 25–145% tariff differential with no qualification period and no minimum order requirement. For Australian companies, AANZFTA preferential rates apply and HCMC-to-Sydney sea freight runs 10–14 days.
Our contract manufacturing services cover CNC machining, injection molding, sheet metal fabrication, and mechanical assembly & welding under a single quality system. One supplier, one audit, one point of contact for your entire manufactured BOM.
Vietnam Manufacturing Services — Capabilities
All processes are performed in-house at our Bình Chánh facility. No brokering, no subcontracting without written disclosure.
CNC Machining
- DMG Mori 5-axis — 500mm × 600mm envelope
- Mazak QT turning — Ø350mm × 900mm
- Standard lead time: 7–12 days | Expedited: 5–7 days
- Materials: Al 6061/7075, SS 303/304/316/17-4 PH, Ti Grade 5, PEEK, POM
Injection Molding
- Prototype molds: P20 steel, T1 in 15–25 days
- Production tooling: H13/S136, rated to 1M shots
- Resins: ABS, PP, PC, PA66, POM, TPU
- Overmolding and insert molding in-house
Sheet Metal Fabrication
- Laser cutting: ±0.1mm positional accuracy
- Bending: ±0.5° angular tolerance
- Lead time: 5–10 days
- Finishing: powder coat, bead blast, electropolish
Tooling & Die Making
- Wire EDM: ±0.003mm, hardened steel to 62 HRC
- Tool steel: SKD11 (D2), SKD61 (H13)
- Progressive die tooling with CMM-verified tryout
- Lead time: 20–35 days
Assembly & Welding
- 5 weld processes — MIG · TIG · Laser · Spot · Robotic
- Sheet metal thickness: 0.5–12mm
- Post-weld CMM inspection: ±0.005mm
- Lead time: 5–10 days (standard weld fabrication)
Surface Finishing
- Anodize: Type II & III, MIL-A-8625F
- Electroless nickel: ASTM B733
- Passivation: ASTM A967 / AMS 2700
- Applied post-assembly — no re-inspection gap
Why Vietnam for Contract Manufacturing
The commercial case for Vietnam contract manufacturing in 2026 is driven by two factors: tariff exposure and logistics proximity. Vietnam-origin goods enter the US under 0% Section 301 tariffs. Chinese-manufactured parts in the same HS code categories currently carry 25–145%. For components with a $5 unit cost, that is a $1.25–$7.25 landed cost difference per part — before accounting for any factory pricing difference.

- Air freight LAX / SFO: 2–3 days
- Sea freight West Coast USA: 18–22 days
- Sea freight Sydney / Melbourne: 10–14 days
- Cat Lai Port — 20km from our facility
- Tan Son Nhat Airport — 25km
- EVFTA: reduced / zero duty to EU
- AANZFTA: preferential rates to Australia
- Section 301 tariff exposure: 0%
- 30–40% lower landed cost typical
- Tooling cost competitive with South China
- No mold ownership disputes
- Full documentation trail available for FDA / TGA audit
- EVFTA eliminates duty on EU shipments
Quality System — Contract Manufacturing Standard
Every shipment from our Vietnam contract manufacturing facility leaves with a CMM dimensional report. First Article Inspection is not optional and is not charged separately — it is included in every order. Dimensional data is generated on Zeiss Contura and Mitutoyo equipment, reported against your drawing revision. Cpk is tracked in-process; we do not ship lots with Cpk below 1.67 without customer notification and written approval.

- Zeiss Contura CMM — 700 × 1000 × 600mm
- Mitutoyo CMM — secondary verification
- Keyence vision measurement system
- Surface profilometer — Ra to 0.01μm resolution
- Hardness testing: Rockwell + Vickers
- FAI report — 100% of orders
- CMM dimensional report vs drawing
- Material certificate (mill cert)
- Cpk / Ppk summary for critical features
- Finish compliance cert (anodize, passivation, etc.)
- Export documentation and HS code confirmation
Rapid Prototype to Low-Volume Production
Development teams running design validation typically need 5–50 parts with the same documentation package as production. Our contract manufacturing services include a rapid CNC prototyping track that delivers FAI samples in 3–5 days. Prototype injection molds — built to production steel standards in P20 — deliver T1 samples in 15–20 working days with a full CMM report and material certificate.
Low-volume production (50–5,000 units) runs from the same tooling as prototyping. No re-qualification, no tooling surcharge. When volumes scale, we add cavities or cut a hardened production tool using the validated gate and cooling geometry.
- Rapid CNC Prototyping Vietnam — FAI samples in 3–5 days
- Prototype Injection Molding Vietnam — T1 delivery 15–25 days
- Sheet Metal Prototyping Vietnam — 5–10 day lead time
Vietnam Contract Manufacturing — FAQ
Vietnam Manufacturing Services — Full Capability List
- Vietnam vs China CNC Machining Cost 2026 — landed cost breakdown, tariff stack, Section 301 analysis
- CNC Machining Vietnam — 3-axis, 4-axis, 5-axis, turning, mill-turn
- 5-Axis CNC Machining Vietnam — complex geometry, tight-tolerance aerospace and medical parts
- Aluminum CNC Machining Vietnam — 6061-T6, 7075-T6, 5052
- Stainless Steel CNC Machining Vietnam — 303, 304, 316L, 17-4 PH
- Injection Molding Vietnam — prototype to production
- Custom Injection Molding Vietnam — single/multi cavity, insert, overmolding
- Sheet Metal Fabrication Vietnam — laser cut, bend, weld, finish
- Assembly & Welding Vietnam — mechanical assembly, BOM integration, structural welding, CMM-verified
- Tooling & Die Making Vietnam — progressive die, EDM, jig & fixture
- Anodizing Vietnam — Type II & III, MIL-A-8625F
Send Your Drawings for Review
Technical review and DFM comments within 24 hours. Pricing within 48 hours for standard jobs. No commitment required.
Request a Technical Quote →
Talk to an Engineer →
Direct line: duc.nguyen@vncontx.com ·
